Mobile ship-loading technology

Additional port throughput

A parallel loading line for an additional cargo flow — set up at your berth, while the port’s main equipment keeps working on its own flow.

We don’t sell equipment. We take on the additional loading operation.

Prefer email? [email protected]

500–600 t/hcurrent working throughput
1,000–1,200 t/hwith an added feeder and extended line
Handysizevessels up to 35,000 tonnes
Per tonnepayment for cargo actually loaded
When a terminal needs additional capacity

The cargo is there. The capacity is limited.

We are useful where the existing setup can no longer put additional volume to work quickly.

01

The main loading line is occupied

The port’s own equipment is already fully loaded with its current flow.

02

There is a free or underused berth

Berth capacity exists, but there is no loading line working on it.

03

A new or seasonal cargo flow has appeared

Extra volume arrives that the current setup was not planned for.

04

Capacity is needed without lengthy construction

The terminal needs results this season, not after a construction project.

We reinforce the existing terminal rather than replace its infrastructure.
How the additional flow is created

Parallel ship loading

A separate technological flow operates simultaneously with the port’s main line.

  1. 1
    Receiving cargo from road transportTrucks unload directly into the hopper of the ship-loading machine.
  2. 2
    Feeding via a mobile hopper and conveyorA separate line that does not depend on the port’s main equipment.
  3. 3
    Loading and distributing cargo in the holdA controlled feed point fills the hold evenly, including corners.

Explore the technology

Mobile ship-loading conveyor loading a bulk carrier at the berth
The port’s main equipment keeps working on its own flow.
What the terminal gets

An additional production resource

We are useful to the port not as an equipment seller, but as additional working capacity.

Reserve

Capacity reserve when the main line is busy.

Idle berths at work

Use of berths that are free or underused.

Flexibility

To match the actual cargo flow, the season and new contracts.

Responsibility

Equipment, personnel and support on our side.

Scale

A proven scheme can be scaled once the result is confirmed.

How the cooperation is structured

One joint operation

First the terminal’s task. Then the technological scheme, responsibility and commercial terms.

Terminal

  • Berth
  • Infrastructure
  • Cargo flow and schedule
  • Coordination of services

Mir Novy

  • Technological scheme
  • Equipment
  • Personnel
  • Loading and support
Payment per tonne actually loadedOur result is tied to the terminal’s real operations, not to the sale of a piece of equipment.
How cooperation works
We start with a real task

One berth. One flow. One pilot.

That is enough to understand the real effect of the technology at your terminal.

Pilot in detail

Berth inspection

We look at the berth and the existing loading setup on site.

Cargo flow

Together we select one specific cargo flow for the pilot.

Configuration

We choose the equipment configuration for that berth and cargo.

Agreed parameters

Throughput, safety and loading quality are agreed in advance.

Pilot & evaluation

We run the pilot operation and evaluate the result together.

If the scheme works, we scale it by adding feeders and extending the line. If not, the port isn’t left with unsuitable purchased equipment.

Next step

Let’s find where we can strengthen your terminal.

We choose one berth and one real cargo flow. Then we prepare a project-specific technological scheme for your technical team.

Message us on WhatsApp [email protected] WhatsApp: +44 7715 515022  ·  Email: [email protected]